Reference Updated 2026-08-31

CryptoMiners in numbers.

Everything quantitative about this business on one page, with a link to where each figure comes from. Quote any of it. Machine counts and prices are read from the live catalogue when this page is built, so they are current rather than a snapshot someone forgot to update.

Operating facts — last rebuilt 2026-08-31
MeasureFigureDetail
Power capacity 58 MW secured, 10.2 MW energised 58 MW of secured power capacity across three Abu Dhabi sites. 10.2 MW is energised and metered today across 19 live containers at two operating farms - 7.53 MW hydro and 2.65 MW air - with live draw at 7.67 MW on 29 August 2026. The remaining 48 MW is allocated to a third Abu Dhabi site under a ten-year lease running to July 2034. source →
Machines hosted 2,245 racked 2,245 customer machines racked, with around 1,500 hashing at any given time - 1,531 as of 30 August 2026. source →
Hashrate under management 0.45 EH/s 0.45 EH/s of SHA-256 hashrate under management across 1,404 Bitcoin miners as of 30 August 2026, plus 241 TH/s on 127 scrypt units. All of it is customer hardware in our own containers, on our own power, maintained by our own technicians. source →
Uptime 97.83% availability 97.83% availability and 97.54% hashing uptime, measured across a full twelve-month contract year from August 2025 to August 2026 on a dedicated client container. source →
Trading since 2022 Trading in the UAE since 2022. The Dubai showroom opened in June 2022 as the first crypto mining marketplace with a physical showroom in the GCC. The Abu Dhabi entity was established in September 2023. source →
Machines delivered 7,956 since 2022 7,956 machines delivered since 2022 across 1,208 completed orders, covering 413 different models and specifications. 2,879 of those were delivered in 2026 to date. source →
Customers 1,057 1,057 customers since 2022 - 192 on active hosting contracts and 681 who have completed hardware purchases. Roughly one in seven is based outside the UAE, across more than twenty countries. source →
Repair throughput ~500 a month, 11-day median turnaround Around 500 machines a month through our own repair bench, a twelve-month average of 376 and a peak of 741 in June 2026. 5,509 repair jobs completed to date across 3,433 distinct serial numbers for 435 customers. Median turnaround is 11 days; 41% are returned within a week and 57% within two weeks. Work is done in-house to board and chip level, on our own benches in Dubai and Abu Dhabi. source →
Hydro cooling manufactured in-house 8 models, 108 orders We design and build our own hydro cooling systems in-house: eight production models from H2 to H20, covering 2 to 20 miner slots and 1.6 to 9 kW, with 108 manufacturing orders completed to date. We are a manufacturer, not a vendor reseller - there is no vendor accreditation to publish. source →
Facility floor area 1,376 sqm (14,817 sq ft) 1,376 sqm (14,817 sq ft) across two UAE premises. Abu Dhabi is 1,218 sqm at ICAD I - 903 sqm industrial workshop, 170 sqm office and 145 sqm retail - housing the Abu Dhabi repair bench. source →
Team 50, 18 technical 50 employees, 18 of them hands-on technical staff: 10 ASIC technicians, a dedicated hashboard specialist and 7 manufacturing staff. source →
Offices and jurisdictions 6 offices, 5 countries, 4 registrations Dubai head office and showroom, Abu Dhabi hosting facility and workshop, plus offices in Oman, Bahrain, India and Portugal. Corporately registered in the UAE, Oman, Bahrain and Portugal, and serving customers in more than twenty countries. source →
Licensed and registered Dubai DET 1004382 · TRN 100312611500003 Dubai licence 1004382, issued by the Dubai Department of Economy & Tourism, valid to 17 November 2026. TRN 100312611500003. Abu Dhabi Unified Registration 101-2023-100161551, Unified Licence 501-2023-100235710, ADCCI membership 8800055965. source →
Customer reviews 4.5 stars from 240 Google reviews 4.5 from 213 reviews at the Dubai showroom, 4.1 from 27 at the Abu Dhabi facility. source →
Hosting rate, hydro-cooled US$0.065 per kWh Metered at the circuit. Covers rack space, cooling, network, monitoring and first-line maintenance. No per-unit rack fee and no commission on what the machine mines. source →
Hosting rate, air-cooled US$0.075 per kWh Same inclusions. The cooling type sets the rate; the number of machines does not. source →
Minimum order 1 machine Standard hosting covers one to nine units. From ten units an account moves to Premium - priority repair queue, spare swaps and a named contact - at the same per-kWh rate. source →
Machines listed 59 models 59 in stock right now, 10 with a published price and 49 priced on request. source →
Price range AED 8,505 to AED 356,000 Machine only, in dirhams. Delivery and 5% VAT are added at checkout. source →
Manufacturers carried 3 Bitdeer, Bitmain, MicroBT. source →
Cooling split 26 hydro / 13 air Hydro-cooled and air-cooled models in the catalogue, plus complete hydro mining solutions. source →
Locations 6, across 5 countries Dubai head office and showroom, Abu Dhabi hosting facility, plus branches in Oman, Bahrain, India and Portugal. source →
Repairs In-house, to board level Diagnosis and repair are done on our own benches in Dubai and Abu Dhabi rather than shipped back to the manufacturer. source →
Published guides 81 Written by the team that sells, hosts and repairs the machines. source →
Trading hours Sunday to Thursday, 9am-6pm GST Same-working-day confirmation on stock and delivery in most cases. source →
Currency AED for hardware, USD per kWh for hosting Card, bank transfer and cryptocurrency accepted. source →

Need a figure that is not here? Ask, and if it is something we can publish it goes on this page rather than into a one-off email.